Back to HOME

 

. ...........................

Some of our Main Customers & Projects................................................

.............................................

  • 2004 FORD MOTOR CO. Tooling Management
  • 2002 Focus
  • 1999 Focus
  • 1995 Mystique/Contour
  • 1994 Pick Up Truck
  • 1991 Grand Marquis
  • 1988 Thunderbird/Cougar
  • 1988 Topaz Nuevo Modelo
  • 1987 Taurus/Sable
  • 1985 Mini-Robot
  • 1985 Pick Up Truck
  • 1983 Topaz Tempo
  • 2005 Remanufacture transguns
  • 2005 Tilt Carts for CC30/CC91 Containers
  • 2005 Pneumatic Lift & Rotate Table
  • 2004 PT-27 Crusier
  • 2002 DR Pick up
  • 1999 PT-44 Crusier
  • 1996 T-300 Pick up
  • 1996 JX Sebring
  • 1995 JA Stratus
  • 1993 PL-22 Neon
  • New Beetle Cabrio: subassembly underbody 1 & underbody 2B2
  • Foundry Plant : 4 cylinder head handling
  • A4-NB: sun roof mounting
  • A4-NB & NB Cabrio: front and rear axles
  • Derby: door mounting
  • Combi: rear axle end effector
  • Cabrio, Derby: sub-assembly, body shop
    rear axle
  • A3 Front-end mounting end effector
  • 2005 Portable Transgun Weld Station
  • 2002 H215 Cab System EAP
  • 2000/01 NGV Steel Cab (SE + CIW)
  • 1999 Brazil Steel /Aluminum Cab
  • 1999 PEC (Proto Plant)
  • 1998 HD Aluminum Cab
  • 1997 QSP Steel Cab
  • 1997 Flat Back Cowl
BLUE DIAMOND
TRUCK COMPANY
  • Simulation
  • Process
  • Logistics
  • Tool Design & Build
  • Material Handling
  • Facilities
  • Training

  • Flat Back Cowl 2003
  • Flat Back Cowl 2000

VOLVO
  • Lean Manufacturing 2001

  • Case Assembly Verification System 10.5 and
    11.5 2003
  • Pallet Pull off Spur 2003
  • Axle Assembly Line 2001/02
  • 3rd Member & Final Line (six position) pallet transfer system 2001/02
  • Design & Build material handling systems for the final line including pallet transfer system (eight position) 2001/02


  • AZTEC SALTILLO: Complete Installation Services
    -Facilities
    - Air/Water Mains
    -Overhead Structure
    -All Process Equipment
    -Comau Framer
    -Robots
    -Tooling
    -Metal Finish Booths
  • GMT 805 TOLUCA: Material Handling
  • Final Axle Assembly System GMT-201 2003/4
  • 2D Vision Systems 2003/4
  • Servo operated bushing setting system
  • Assembly conveyor
  • Manipulator
  • Pick-N-Place system
  • Mig Welding Assembly Line GMT 201 Twist Axle
    2003/4
    Includes:
  • 15 MIG Robots
  • Automated parts transfer and buffer system between operations
  • Tooling
  • Automation
  • GMT 900 End Gate Line Integration
  • 2 Pedestal Welders with Nut Verification System & automatics nut feedings
  • Remanufacture transguns & welding controls systems (5)
  • Hemmer
  • 2 material handling robots
  • 2 complete sealer system
  • Checking system
  • 14 Special Manual Welding Machines
  • 15 Robot Pedestal Welders
  • Design, Engineering, Build and Integration
  • Complete seat turn devices
  • Seat pallet of constuction to shipment pallet transfer
  • End effector to put a complete seat in to a constuction pallet
  • End effectors for seats
  • Tack End effectors
  • Spot and projection welding machines
  • A5 End effectors

These are only some of our projects, allow us to show you our presentations and accomplishments
to help you with your company requirements.

back to the top

 

From Mexico (55) 1163-1763 Fax: (55) 1163-1764
From USA & Canada. Ph: 011 [52]-(55) 1163-1763 Fax: 011 [52]-(55) 1163-1764
Foreign Calls. Ph: [+52]-(55) 1163-1763 Fax: [+52]-(55) 1163-1764
Ant. Camino A Sta. Mónica No.7 Tlalnepantla, Edo. de México
This website belongs to Icesa-Modicon (Inovasys, S.A. de C.V.). ® 2003 Mexico, D.F.